Electrical EngineeringElectrical Systems Upgrade
Village of Hempstead
H2M evaluated options for replacing their aging electrical infrastructure built during the late 1920s. The project entailed demolition of the exiting 4160 volt service, electrical switchgear, motor controls, synchronous motors and direct drive backup engines. A new 480 volt, 2000 amp services was installed with new solid state motor controls and duel diesel fired generators in sound attenuated enclosures. The generators provide backup power to all of the water plant wells and booster totaling 1300 horsepower.
Electrical Systems Upgrade
Other Projects
-
CCTV Security Systems
Hicksville Water District More -
Track and Field Lighting
Mount Sinai Union Free School District More
-
Power System Redistribution
United States Postal Service More
