HUNTINGTON SEWER DISTRICT-REPLACEMENT OF RBCs AT WASTEWATER PRE-TREATMENT FACILITY

Under the Additional Services Task in the Annual Retainer Agreement, the Huntington Sewer District requested H2M provide engineering services for the replacement of existing rotating biological contactors (RBCs) at the District’s scavenger wastewater pre-treatment facility. The purpose of the scavenger waste pre-treatment facility is to reduce the concentration of BOD and suspend solids from septic […]

NCDPW-PHASE E2 – UNIT SUBSTATION No. 2 AND ELECTRICAL DISTRIBUTION

The Nassau County Bay Park Sewage Treatment Facility sustained catastrophic damage as a result of Super Storm Sandy and the associated high winds, flooding, and salt water intrusion. H2M was called upon for electrical engineering assistance and to provide design and construction administration services. The significant storm surge damaged various mechanical equipment, electrical equipment, electrical […]

NJAW COASTAL NORTH TREATMENT PROCESS & CHEMICAL FEED EXPANSION

In Winter of 2014, NJ American Water Operations and Engineering identified a combination of planning trends that indicated a possible occurrence of peak demands for a series of 2-4 days, during the system’s Summer operating season, in excess of the system’s firm capacity. H2M was brought in to evaluate the various source treatment and property […]

VILLAGE OF PATCHOGUE-WASTEWATER TREATMENT FACILITY UPGRADE & EXPANSION

H2M WASselected by the Village of Patchogue in 2004 to prepare the engineering feasibility study followed by the Facility Plan in 2005 and design in 2007 to upgrade and expand from the existing 0.5 million gallons per day (MGD) rotating biological contractor (BNC) facility to a facility with new 0.8 MGD biological nutrient removal (BNR) […]

WATER AUTHORITY OF WESTERN NASSAU COUNTY (WAWNC)-WELLHEAD TREATMENT FOR VOC REMOVAL

H2M was responsible for the professional engineering services associated with the design of two new identical wellhead treatment systems for volatile organic compound (VOC) removal at three pump stations servicing four wells. This project was noted as the highest priority project in the WAWNC Master Plan. A fourth pump station, servicing five booster pumps and […]

BRICK TOWNSHIP-MUNICIPAL UTILITIES AUTHORITY

H2M was selected by the Brick Township Municipal Utilities Authority (BTMUA) to provide professional engineering services to comprehensively evaluate its system assets, existing and future demand centers, special regulatory criteria as a surface water supplier in NJ Water Supply Critical Area #1 – and combine those demands and constraints into a new Water Supply Master […]

DEVELOPMENT REVIEW SERVICES-VARIOUS MUNICIPALITIES, NEW JERSEY AND NEW YORK

H2M’s Planners have extensive experience providing development application review services to Planning Boards, Zoning Boards and Combined Land Use Boards throughout New Jersey. Our appointments have included communities as diverse as: Livingston Township, Rockaway Borough, Pompton Lakes Borough, Hackensack City, Lafayette Borough, Lodi Borough, and Cranford Township, as well as multiple communities within the Hudson […]

4th WARD MNI REDEVELOPMENT STUDY AND PROPERTY CONDITIONS ASSESSMENT-CITY OF NEWARK

H2M conducted site visits of each property including interior and backyard inspections, where feasible, and met with interested property owners to discuss the redevelopment process. During the three days of inspections, we used tablets and mobile Geographic Information System (GIS) software, Fulcrum, to document existing building and site conditions of each property. Designing our own […]

LITTLE FALLS-AFFORDABLE HOUSING PROPERTY SURVEYS

H2M provided comprehensive Affordable Housing Services to municipalities throughout the state of New Jersey to comply with communities’ legal obligation to build affordable housing. One aspect of a municipality’s affordable housing obligation is it’s “rehabilitation obligation.” As Affordable Housing planners for the Township of Little Falls, New Jersey, we undertook a town-wide property survey to […]

IN-CITY WATER SUPPLY RESILIENCY DRAFT ENVIRONMENTAL IMPACT STATEMENT (DEIS)

H2M was part of a consultant team that prepared a Draft Environmental Impact Statement (EIS) that analyzed the potential environmental impacts associated with various potential future operating scenarios of the re-activation of the Queens Groundwater System. Environmental assessment was required to support to support the renewal of NYCDEP’s Water Supply Permit from the NYSDEC. During […]