Fairfield Hills Campus

Fairfield Hills Campus Water Main Replacement Newtown, CT H2M designed a full replacement of the Fairfield Hills Campus’ water distribution system — a system in operation since 1933 when the campus was Fairfield State Hospital. With the frequent appearance of brown water via potable water [...]
UBS Arena at Belmont Park

UBS Arena at Belmont Park

UBS Arena at Belmont Park Water Main Replacement Elmont, NY H2M designed a water main replacement to provide water to the UBS Arena while maintaining adequate flow, pressure, and fire protection for existing customers within the area. The newly opened UBS Arena at Belmont Park [...]
City of Pompano Beach

City of Pompano Beach Water Treatment Plant

City of Pompano Beach Water Treatment Plant Water Treatment Plant Upgrades Pompano Beach, FL H2M is conducting piloting of ion exchange and GAC media to determine the best media option for the removal of PFAS at the City of Pompano Beach Water Treatment Plant (WTP). [...]
Borough of Ramsey

Borough of Ramsey

Borough of Ramsey Arsenic and  PFAS Water Treatment System Ramsey, NJ Six customized containerized arsenic treatment systems were manufactured, delivered, and installed as water treatment upgrades to existing wells. Two of the six containerized systems also remove PFAS to non-detect levels via ion exchange vessels [...]
West Ave Water Tank Rehabilitation

West Avenue Water Tank

West Avenue Water Tank Pedesphere Water Tank Rehabilitation New Haven, CT H2M supported the South Central Connecticut Regional Water Authority in the coating rehabilitation of their West Avenue single pedesphere water tank. The South Central Connecticut Regional Water Authority’s West Avenue steel 1MG potable water [...]
Township’s Water System

Township’s Water System

Township’s Water System New Water Storage Tank and Transmission Main Pequannock, NJ The Township’s water system was a pumped storage system in which continuous pumping was required to maintain water pressure in the distribution system. We recommended that this systems be replaced with a gravity [...]
Upper Ringwood Zone Water System

Upper Ringwood Zone Water System

Upper Ringwood Zone Water System Zone Water System Upgrade Ringwood, NJ The Borough of Ringwood needed to upgrade the Upper Ringwood Zone Water System. The Upper Ringwood Zone is located at the far end of the Ringwood system and depends upon supply from wells and [...]
South Huntington

New Water Supply Well

New Water Supply Well Water Supply Development Huntington Station, NY H2M had the responsibility of locating and developing a new public supply well to offset the increased demand on the water supply system from a new proposed housing development. A new proposed housing development within [...]
Manhasset Lakeville Water District

Lakeville Road Plant

Lakeville Road Plant Well and Pump House Replacement Lake Success, NY The Manhasset-Lakeville Water District retained H2M to design a replacement well and pump house at Lakeville Road Plant. The existing potable water supply well at the Lakeville Road Plant had experienced multiple failures over [...]
Westchester Joint Water Works

Winged Foot Tank

Winged Foot Tank Tank Rehabilitation Mamaroneck, NY Over the years, H2M has completed the construction of several new tanks, tank rehabilitation, and annual tank inspections for Westchester Joint Water Works. Upon inspecting the Winged Foot Tank in Mamaroneck, NY, it was determined rehabilitation was needed. [...]

Birch Street Facility Water Tank

Birch Street Facility Water Tank Composite Elevated Storage Tank West Hempstead, NY As the existing WHWD Birch Street facility tank reached the end of its useful life, the Board of Commissioners and Superintendent knew that the new design had to be carefully developed, continuing to [...]
Brookhaven National Lab

Water Storage Tank in Upton NY

Water Storage Tank in Upton NY Water Tower Replacement Upton, NY H2M upgraded Brookhaven Lab’s water storage with a new Pedesphere Tank. At Brookhaven National Laboratories in Upton, NY, H2M was chosen to address the challenges posed by an aging 0.3MG multileg water storage tank, [...]

Atlantic City Airport

Atlantic City Airport Atlantic City Airport Atlantic City, NJ Due to firefighting drills held at the Atlantic City Airport, PFC levels are high in the systems ground water and surface water supplies. The ACMUA tasked H2M with designing a system to bring them into compliance [...]
Veolia

Throughout Bergen and Hudson Counties

Throughout Bergen and Hudson Counties Lead Service Line Replacement Bergen and Hudson Counties, NJ The program included replacement of lead service lines located throughout Bergen and Hudson counties. H2M was selected because of our positive reputation working with Veolia on the annual water main replacement [...]

Ulster County Eastern Correctional Facility

Ulster County Eastern Correctional Facility Water Tower and Water Softening System Replacement Napanoch, NY We replaced the water softening system and 1.5-million-gallon steel elevated water storage tank at the Eastern Correctional Facility in Ulster County, NY. The tank was originally constructed in 1990, and over [...]

Five Points Correctional Facility

Five Points Correctional Facility Water Tower Rehabilitation Napanoch, NY The Five Points Correctional Facility in Romulus, NY, is home to a pedesphere tank which can hold up to 750,000 gallons of water. In the time since the tank’s construction in 2000, its coatings were reaching [...]