Yaphank Correctional Facility

Yaphank Correctional Facility Expansion Design Yaphank, NY The existing Yaphank Correctional Facility was overcrowded, creating a poor environment for both staff and inmates, and required extensive renovation and modernization. In order to satisfy the New York State Commission of Corrections (NYSCOC) who had granted the [...]
Village of Washintonville

Village of Washingtonville

Village of Washingtonville Wastewater Treatment Plant Upgrade and Expansion Washingtonville, NY The Village of Washingtonville is under Consent Order by New York State to decrease its I/I into their WWTP conveyance system and increase the capacity of the WWTP from 700,000 GPD to 850,000 GPD. [...]
Village of Patchogue

Village of Patchogue

Village of Patchogue Wastewater Treatment Facility Upgrade and Expansion Patchogue, NY We were selected by the Village of Patchogue in 2004 to prepare the engineering feasibility study followed by the Facility Plan in 2005 and design in 2007 to upgrade and expand from the existing [...]
Parsippany – Troy Hills Wastewater Treatment Plant

Parsippany – Troy Hills Wastewater Treatment Plant

Parsippany - Troy Hills Wastewater Treatment Plant Wastewater Interceptor Evaluation Parsippany, NJ Since the interceptors and siphons to the Parsippany - Troy Hills Wastewater Treatment Plant had not been cleaned or evaluated since being placed into service more than 40 years ago, H2M was called [...]
Enterprise Park

Enterprise Park

Enterprise Park Sewage Treatment Plant Upgrade Calverton, NY H2M designed upgrades to the sewage treatment plant at Enterprise Park on behalf of the Calverton Sewer District. The upgrade was necessary for the Town of Riverhead to provide wastewater infrastructure associated with the listing to sell [...]
Parsippany Troy Hills Screening and Grit Facility

Township of Parsippany-Troy Hills Wastewater Treatment Plant

Township of Parsippany-Troy Hills Wastewater Treatment Plant Screening and Grit Facility Improvements Parsippany, NJ We prepared an engineering report and bid documents for improvements to the screening and grit facilities at the Township of Parsippany-Troy Hills Wastewater Treatment Plant. The engineering report described existing conditions, [...]
Cedar Creek Water Pollution Control Plant

Cedar Creek Water Pollution Control Plant

Cedar Creek Water Pollution Control Plant Secondary Treatment Improvements Wantagh, NY H2M was selected to evaluate the need for and design secondary treatment improvements at the Cedar Creek Water Pollution Control Plant (WPCP). H2M conducted an existing condition assessment of the 72 MGD Cedar Creek [...]
Northeast Branch of the Nissequogue River

Northeast Branch of the Nissequogue River

Northeast Branch of the Nissequogue River Culvert Replacement Yaphank, NY H2M was retained to assess possible improvements to address localized flooding around the northeast branch of the Nissequogue River. Upon H2M investigating the possible improvements to address localized flooding around the northeast branch of the [...]
City of New Rochelle - Drainage Improvements

2,000-Acre Watershed

2,000-Acre Watershed Drainage Improvements New Rochelle, NY The City of New Rochelle selected H2M to design improvements to existing drainage systems that serve a 2,000-acre watershed. The existing drainage system encompassed more than 5,900 linear feet of storm drain pipe that ranged in size from [...]
Brick Township MUA

MUA Property and Adjacent Neighborhood

MUA property and Adjacent Neighborhood Stormwater Quality Improvements Brick Township, NJ H2M was selected to improve the flow and discharge characteristics of stormwater runoff from the Brick Township MUA property and the adjacent neighborhood; and to improve water quality discharge to the Metedeconk River through [...]
Multiple Roadways

Multiple Roadways

Multiple Roadways Drainage Improvements Patchogue, NY The Village of Patchogue selected H2M to provide professional services for the installation of a porous concrete gutter and perforated pipe drainage system in conjunction with the construction of a new sewer collection system along River Avenue, Sunset Lane, [...]

Suffolk County Indian Island Golf Course

Suffolk County Indian Island Golf Course Advanced Wastewater Treatment Facility Wastewater Reuse for Golf Course Irrigation Riverhead, NY The Riverhead Sewer District was required to upgrade the existing sewage treatment plant in order to achieve a total nitrogen effluent limitation of 3.2 mg/l based on [...]

Wastewater Treatment Facility Plant

Wastewater Treatment Facility Plant Replacement of Plant Water Systems Oyster Bay, NY H2M was retained by the Oyster Bay Sewer District to design the replacement of their wastewater treatment facility plant water system. The existing pumps were in service for over 20 years and had [...]

Facility at MacArthur Airport

Facility at MacArthur Airport Zero Discharge Wash Water Permit Ronkonkoma, NY H2M worked with Enterprise Rent-A-Car to prepare an application and supporting documentation for a Zero Discharge Wash Water Permit. H2M worked with Enterprise to prepare an application and supporting documentation for a “Zero Discharge [...]
Pumping Stations Rehabilitation

North Yonkers Sewer District

North Yonkers Sewer District Pumping Stations Rehabilitation Yonkers, New York The Westchester County Department of Environmental Facilities hired H2M to help rehabilitate the Alexander Street and Irvington Pumping Stations in the North Yonkers Sewer District. The Alexander Street Pumping Station was originally constructed in the [...]
Wastewater Pump Station and Force Main

Downtown and Business District

Downtown and Business District Wastewater Pump Station Design Wyandanch, NY H2M prepared bid documents for the construction of a new wastewater pumping station with an average daily design wastewater flow of 380,000 GPD. The Town of Babylon is committed to the development of a viable [...]
Continental Villas Pump Station and Force Main

Continental Villas

Continental Villas Sewage Pump Station and Force Main Locust Valley, NY H2M planned and designed the pump station and conveyance system to serve all 60 residential parcels within Continental Villas. The Continental Villas subdivision in Locust Valley, NY was developed in the 1960s during a [...]
Sewage Pump Station Investigation and Design Services

Wastewater Pump Station on Governors Island

Wastewater Pump Station on Governors Island Sewage Pump Station Investigation and Design Services New York, NY H2M was selected to investigate and provide design services for improvements to the wastewater pump station on Governors Island in New York City. The almost 50-year-old pump station conveys [...]
Borough of Spring Lake Height

Shore Road and Black Creek Pump Stations

Shore Road and Black Creek Pump Stations FEMA Flood Mitigation - Reconstruction of Wastewater Pump Stations Spring Lake Heights, NJ H2M designed enhancements to the Shore Road and Black Creek pump stations to provide flood-proofing measures. The Borough of Spring Lake Heights owns and operates [...]
Sanitary Sewer Smoke Testing

Mamaroneck Valley District Portion

Mamaroneck Valley District Portion Sanitary Sewer Smoke Testing Scarsdale, NY H2M conducted a smoke test program on the Mamaroneck Valley District portion of the sewer system in the Village of Scarsdale to identify sources of infiltration and inflow (I/I). All sewer flows in the Village [...]
Route 23 Sanitary Sewer Extension

Route 23 Northbound and Southbound

Route 23 Northbound and Southbound Sanitary Sewer Extension Pequannock, NJ We designed the Route 23 Northbound and Southbound sanitary sewer extensions, as part of a larger effort by the Township to achieve the objectives of its Sanitary Sewer Master Plan. The Route 23 Northbound and [...]
City of New Rochelle - Sanitary Sewer Capacity Evaluation Findings Report

Downtown Overlay Zone

Downtown Overlay Zone Sanitary Sewer Capacity Evaluation Findings Report New Rochelle, NY H2M was retained to analyze the existing sanitary sewer system within the downtown area of the City of New Rochelle as part of a zoning plan. The City of New Rochelle has approved [...]
Town of Smithtown - St. James Dry Sewer

Commercial District on Lake Avenue

Commercial District on Lake Avenue Sanitary Sewer Installation St. James, NY H2M designed the installation of sanitary sewers to the downtown commercial district on Lake Avenue in St. James for the Town of Smithtown. The Town of Smithtown is in the process of updating their [...]
Promesa Residential Services Recovery Center

Promesa Residential Services Recovery Center

Promesa Residential Services Recovery Center Interior Renovation Bronx, NY Our team was contracted by the Dormitory Authority of the State of New York to convert a vacant community healthcare facility into a co-ed residential treatment center for Acacia Network, one of the leading human services [...]

Fairfield Hills Campus

Fairfield Hills Campus Water Main Replacement Newtown, CT H2M designed a full replacement of the Fairfield Hills Campus’ water distribution system — a system in operation since 1933 when the campus was Fairfield State Hospital. With the frequent appearance of brown water via potable water [...]
UBS Arena at Belmont Park

UBS Arena at Belmont Park

UBS Arena at Belmont Park Water Main Replacement Elmont, NY H2M designed a water main replacement to provide water to the UBS Arena while maintaining adequate flow, pressure, and fire protection for existing customers within the area. The newly opened UBS Arena at Belmont Park [...]
City of Pompano Beach

City of Pompano Beach Water Treatment Plant

City of Pompano Beach Water Treatment Plant Water Treatment Plant Upgrades Pompano Beach, FL H2M is conducting piloting of ion exchange and GAC media to determine the best media option for the removal of PFAS at the City of Pompano Beach Water Treatment Plant (WTP). [...]
Borough of Ramsey

Borough of Ramsey

Borough of Ramsey Arsenic and  PFAS Water Treatment System Ramsey, NJ Six customized containerized arsenic treatment systems were manufactured, delivered, and installed as water treatment upgrades to existing wells. Two of the six containerized systems also remove PFAS to non-detect levels via ion exchange vessels [...]
West Ave Water Tank Rehabilitation

West Avenue Water Tank

West Avenue Water Tank Pedesphere Water Tank Rehabilitation New Haven, CT H2M supported the South Central Connecticut Regional Water Authority in the coating rehabilitation of their West Avenue single pedesphere water tank. The South Central Connecticut Regional Water Authority’s West Avenue steel 1MG potable water [...]
Township’s Water System

Township’s Water System

Township’s Water System New Water Storage Tank and Transmission Main Pequannock, NJ The Township’s water system was a pumped storage system in which continuous pumping was required to maintain water pressure in the distribution system. We recommended that this systems be replaced with a gravity [...]
Upper Ringwood Zone Water System

Upper Ringwood Zone Water System

Upper Ringwood Zone Water System Zone Water System Upgrade Ringwood, NJ The Borough of Ringwood needed to upgrade the Upper Ringwood Zone Water System. The Upper Ringwood Zone is located at the far end of the Ringwood system and depends upon supply from wells and [...]
South Huntington

New Water Supply Well

New Water Supply Well Water Supply Development Huntington Station, NY H2M had the responsibility of locating and developing a new public supply well to offset the increased demand on the water supply system from a new proposed housing development. A new proposed housing development within [...]