H2M had the responsibility of locating and developing a new public supply well to offset the increased demand on the water supply system from a new proposed housing development.
A new proposed housing development within the boundaries of the South Huntington Water District increased the demand on the water supply system. Thus, H2M had to locate and develop a new public supply well to offset the increased demand.
After the 2.25 acre site was acquired from the Villages Development Corp, the District authorized H2M to prepare the engineering report and well permit application for a new potable supply well. With an approved well permit, H2M began to design and prepare construction documents for a fully automated supply facility.
The scope of work included in the three contracts associated with this project consisted of: the construction of a new 4,000+ square foot masonry well house and treatment building; construction of a new 600 foot deep potable supply well with a capacity of 1.98 MG per day; installation of site piping; installation of PLC-based controls and instrumentation; installation of motor control center and power distribution; installation of chemical storage and feed systems.
H2M also administered the project through construction, which included on-site construction observation, contractor and owner coordination, shop drawing review, and preparation of contractor payment applications. Upon completion, H2M provided the required completed works certifications to the Suffolk County.