HICKSVILLE FIRE DISTRICT

Based on the District’s requirements, a complete replacement of the existing system was performed. The fueling system upgrade design included the following: Replacement of existing single wall gasoline and diesel storage tanks with new double wall fiberglass underground gasoline and diesel storage tanks. Replacement of […]

VALLEY STREAM UNION FREE SCHOOL DISTRICT No. 24

H2M provided engineering and construction administration services for the heating plant upgrades at the Robert W. Carbonaro, William L. Buck and Brooklyn Avenue Elementary Schools within the Valley Stream Union Free School District. The heating plant consisted of two duel fuel steam boilers. The steam […]

FIRE SUPPRESSION DESIGN FOR A HIGH-RISE, ASSISTED-LIVING FACILITY

Project Info: ENBU 1802; PM: David Mammina/Joseph Ciserano Client: Engel Burman Location: New York, New York Scope: Services include the design of fire pump systems, an automatic standpipe system and automatic sprinkler systems for a new 14-story high-rise in Manhattan. H2M provided complete piping and […]

THIRD PARTY PLAN REVIEW FOR HONDA OF VALLEY STREAM

Project Info: VASV 1701; PM: Rob Ikes Client: The Incorporated Village of Valley Stream Location: Valley Stream, New York Scope: H2M conducted a third-party review of the engineering design for the fire suppression systems at a new Honda car dealership. Design documentation was reviewed for […]

FIRE ALARM SYSTEM DESIGN AT HARRISON HIGH SCHOOL

Project Info: HCSD 1706; PM: Kelly Finzel Client: Harrison Central School District Location: Harrison, New York Scope: Provided design services for the expansion of an existing fire alarm and detection system at Harrison High School. The scope of services included surveying 150,000 square feet of […]

DRY CHEMICAL SYSTEM DESIGN AT PUBLIC WORKS FUEL ISLAND

Project Info: HEMV 1601; PM: Brian Leger Client: Incorporated Village of Hempstead Location: Hempstead, New York Scope: Provided a design for the installation of a dry-chemical, fire-extinguishing system for a new fueling station at the Public Works Facility in Hempstead, New York. H2M’s design incorporated […]

CODE REVIEW FOR A NEW, MIXED-USE, HIGH-RISE BUILDING

Project Info: ECDC 1601; PM: Rob Ikes Client: Erin Construction Development Corporation Location: Yonkers, New York Scope: Performed a life safety analysis and code review for conformance with the 2015 Uniform Fire Prevention and Building Code of New York State. Services included a review of […]

SUPPRESSION SYSTEM INVESTIGATION AT THE YONKERS JOINT WASTEWATER TREATMENT PLANT

Project Info: WCPW 1601; PM: David Leun Client: Westchester County Department of Public Works and Transportation Location: Yonkers, New York Scope: Performed an on-site evaluation of an existing foam-water fire suppression system for protection of chemical storage areas used in water treatment process.  H2M evaluated […]

PLANT ELECTRIC SYSTEM EVALUATION

As part of a large-scale multi-disciplined project, H2M designed a 17,000-square-foot expansion and renovations to an existing 45,000-square-foot residential treatment facility. As part of the project, H2M performed a system analysis study in accordance with NFPA 70E, OSHA, and all local regulations. Studies included short […]

USPS CHILLER UPGRADE

H2M provided complete engineering services from investigation through construction for the upgrades to the chilled water plant at the USPS Bronx General Mail Facility. This project included the installation of the following: Three 250-ton centrifugal chillers One roof mounted, three cell cooling tower Condenser water […]

POWER PLANT COOLING

The Brooklyn OMRDD Campus power plant was in the process of being renovated. As part of the renovation work, the Campus desired to replace the existing roofing system and cooling tower. The project included design services for the replacement of the existing cooling towers serving […]

SCADA DESIGN

Based upon the critical need for standby power, we recommended the Village consider two smaller 750 KW generators as opposed to a single 1,250 KW generator. We raised concerns that a single generator or transfer switch malfunction or failure would completely disable the main Booster […]

FLOOD RESILIENT DESIGN

H2M provided design, permitting, bidding, construction administration and construction inspection for this project. The electrical scope of work included new electrical distribution so the facility could continue operating out of their second floor offices in a flood situation. The design included a new transfer switch, […]

VILLAGE OF FAYETTEVILLE FIRE DEPARTMENT

The Fayetteville Fire Department wanted to combine the Fire/EMS, Volunteers and Students into a single facility that required public access. The project had to garner neighborhood and business acceptance while respecting the attached historic village hall. Pacheco Ross Architects (PRA) generated public support to create […]

NISKAYUNA FIRE DISTRICT No.1

The Niskayuna Consolidated Fire District #1 was outgrowing its existing facility and needed to expand in order to combine a unified space to serve three distinct end user groups, the paid fire department, volunteer fire department and fire district administration. Pacheco Ross Architects (PRA) designed […]

INC. VILLAGE OF HEMPSTEAD

H2M evaluated a variety of reconstruction methods for the residential roads, Tennessee Avenue and Albemarle Avenue in Hempstead. The residential roads serving Tennessee Avenue and Albemarle Avenue in Hempstead exhibited severe deterioration and warranted substantial reconstruction. H2M evaluated a variety of reconstruction methods based on […]

TOWN OF BROOKHAVEN

The Town of Brookhaven Department of Housing and Community Development retained H2M to develop contract documents for the installation of curb and sidewalk along 4,800 feet of Wilson Avenue. The roadway elevations were extremely flat and included minimal drainage infrastructure. We completed a topographic survey […]

GLEN COVE MEWS

H2M was retained by Landing Cove LLC to provide land surveying, civil engineering, and landscape architectural services in connection with the development of the Glen Cove Mews, a 72 condominium unit on approximately 5.6 acres of the 9.34 acre Temple Tifereth Israel property on Hill […]

SUFFOLK COUNTY DEPARTMENT OF ECONOMIC DEVELOPMENT + PLANNING

The use of the site as a duck far has compromised the environmental characteristics of the site and geometry of the stream funning through the property. This project included remediating the impacted portions of the site and development of a new Suffolk County Park. Based […]

TOWN OF SMITHTOWN

The Town of Smithtown needed assistance in restoring the stream flow capacity in the Northeast Branch of the Nissequogue River. These improvements increased the stream’s ability to convey excess groundwater and stormwater away from the headwaters of the watershed. Throughout the years, the Northeast Branch […]

NEW YORK STATE OFFICE OF PARKS, RECREATION+ HISTORIC PRESERVATION

The New York State Office of Parks, Recreation and Historic Preservation selected H2M to design improvements to the existing Main Parking Area at the Planting Fields Arboretum State Historic Park. H2M was selected to prepare the construction documents for this project. The existing main parking […]

STONY BROOK HOTEL

The Stony Brook Hotel is a Hilton Garden Inn flag and is located on the main campus of Stony Brook University. H2M worked closely with the developer and the University to design a building that would fit into the campus aesthetic as well as meeting […]

TOWN OF HEMPSTEAD

In 2006, we began working with the Town of Hempstead Department of Planning and Economic Development in their ongoing effort to redevelop business districts at various locations within the Town. Our task was to improve the quality of the streetscape within designated business districts and […]

TOWN OF NORTH HEMPSTEAD

Before being acquired from Nassau County by the Town of North Hempstead in 2007, Manhasset Valley Park had only a small youth baseball field and antiquated site infrastructure. The park, which borders a freshwater stream and pond, was overgrown with trees and vegetation and prone […]

VILLAGE OF WESTHAMPTON BEACH

The pavement, sidewalk, and drainage systems within the Main Street area of Westhampton Beach have reached the end of their useful life. In turn, the Village has requested replacement of the systems with potential stormwater quality improvements; as well as incorporating pedestrian safety features and […]

WATERWAYS AT BAY POINTE

The Waterways at Bay Pointe is a private community located in Moriches, New York. The roads throughout the community were over 30 years old and had fallen into a state of despair. H2M was retained to assess the condition of over two miles of roadway […]

RITZ CARLTON RESIDENCES AT NORTH HILLS

H2M was retained for comprehensive civil engineering, land surveying and landscape architecture services for a 244 unit, ultra-luxury condominium project for RXR Realty. The project required approvals from Nassau County Department of Public Works, Nassau County Health Department, NYSDOT, NYSDEC and the New York State […]

COLLEGE OF STATEN ISLAND

The College of Staten Island called for reconstruction of two miles of roads including realignment of three roads, relocation of roadway lighting, installation of traffic calming elements, and new signage to improve safety. H2M was retained to assess the condition of the two-mile road that […]

CITY OF NEW ROCHELLE

The City of New Rochelle selected H2M to design improvements to existing drainage systems that serve a 2,000-acre watershed. The existing drainage system encompasses more than 5,900 linear feet of storm drain pipe which ranged in size from 12 to 66 inches in diameter, including […]

Stony Brook University Medical Center

H2M provided land surveying, engineering, landscape architecture, and construction administration services for the Stony Brook University Medical Center. Consultants supporting H2M on this assignment included Dunn Engineering for traffic engineering services, and Desman Associates for parking design services. Two construction costs for the project was […]