Churchill

This project is an affordable residential building restricted to people 55 and older.  It consists of 36 units in a 4-story building on a concrete platform with on-grade parking.  This project was built as part of the Winston Project as the affordable component.  It’s location […]

Brookhaven National Laboratory – Research Support Building

The 2-story Research Support Building features a glass atrium-style lobby connecting two wings of offices covered by a metal panel façade.  It tops the New York State requirements for energy efficiency by 15 percent and the structure is considered Green or environmentally friendly, based on […]

303 Main

This rental apartment complex is an upscale four story residential building built on a podium-style parking garage.  There is a two level parking garage; one level below grade and one level at grade serving the residential units.  The apartments are one, two, and three bedroom […]

34 Willis Avenue Office Building

Located in the Village of Mineola, on the corner of Willis Avenue and Third Street, this site offered a highly visible corner of an office building.  The multi-tenant building has the flexibility for full floor tenants and multiple tenants per floor. The design takes advantage […]

Farmingdale Public Schools – New Aquatic Center and Athletic Field Complex

H2M was responsible for the design of a 26,000 square foot aquatic center with an indoor eight-lane competition swimming pool, and diving board. Adjacent to the competition pool are two sets of locker rooms containing showers and gender-neutral toilet facilities. Training rooms, official’s locker rooms, […]

City of Lethbridge – New Fire Headquarters

The City of Lethbridge wanted to combine its very busy Fire Department with the Regional EOC, 911 call answering point, city-wide IT center, fire marshall fire headquarters, and city fitness facility in one location. Pacheco Ross Architects (PRA) teamed with a prominent local architect local […]

City of Poughkeepsie – New Public Safety Facility

The City of Poughkeepsie needed a new public safety facility to accommodate multiple fire and police functions, in one facility on a challenging urban site. The new facility also needed to accommodate the headquarters and future expansion for the Department’s needs. Pacheco Ross Architects (PRA), […]

Mill Creek Residential Trust – New Residential Units

This project consisted of one, five-story wood framed building over three levels of structured parking, one level of which is above grade with the other two below grade. The building contains a total of 275 units created from an anticipated 25 unit types. There is […]

The Engel Burman Group – Bristal at Sayville Assisting Living Design

H2M was selected to provide design services for the development an assisted living facility for the growing senior population on the South Shore of Long Island’s Suffolk County. The Bristal at Sayville is a 136-unit, 101,000 square foot assisted living facility. The building contains a […]

Westhampton Beach Fire District – New Headquarters Building

H2M provided architectural and engineering services for the new Westhampton Beach Fire District Headquarters building, on the site of the existing headquarters and an old police building. The new 30,000 square foot facility was designed under the LEED 2009 rating system and achieved LEED Gold […]

Harbor Construction Management – New Hotel

H2M was selected by the developer Harbor Construction Management to design an 89,500 square foot, LEED certified hotel on the main campus of SUNY Stony Brook University. The Stony Brook Hotel is a Hilton Garden Inn property, developed in response to the University’s need for […]

Nassau University Medical Center – Library Upgrades

H2M designed a $700,000 renovation and upgrade of The Peter W. Addiego Health Sciences Library at the Nassau University Medical Center. Located within NUMC’s Dynamic Care Building, the Health Sciences Library is one of the largest on Long Island. It supports the patient care, biomedical […]

Terwilliger & Bartone – New Residential Units

H2M was selected by the Terwilliger & Bartone to provide multidisciplinary design services for a residential apartment complex in Farmingdale, NY. This three-story, wood framed multi-family complex comprises 28 studios apartments, 10 one-bedroom apartments, and four two-bedroom units for a total of 42 apartments with […]

BAPS Development – New BAPS Shri Swaminarayan Mandir

To address the growing Hindu population on Long Island and the need for a closer place of worship, H2M designed a 42,000 square foot, two-story community facility for the BAPS (Bochasanwasi Akshar Purushottam Swaminarayan) Development team. Sustainable features such as in-floor radiant heating, tankless water […]

Our Lady of Sorrows Church – Fire Damage Reconstruction

Restoration of the Our Lady of Sorrows RC Church after a devastating fire.  The church suffered extensive damage to its ceiling, roof, floors, walls, stained glass and altar.  To conserve the integrity of the sanctuary ceiling design, beam smoke detectors which utilize an optical beam […]

Western Suffolk BOCES – Outdoor Learning Lab

H2M was selected by Western Suffolk BOCES to design a replacement to their  existing outdated outdoor learning lab located on the North Shore of Long Island, nestled in the north corner of the Sunken Meadow State Park. The proposed 6,000 square foot facility is an […]

Composite Elevated Storage

As the existing WHWD Birch Street facility tank reached the end of its useful life, the Board of Commissioners and Superintendent knew that the new design had to be carefully developed, continuing to be a symbol of the West Hempstead community. In conjunction with the […]

Battery Energy Storage

H2M was been retained by multiple developers to support development of five utility scale battery energy storage projects ranging in capacity from 25 to 80 MW.  These projects are located in New York City and Long Island with Power Purchase Agreements anticipated with Con Edison […]

Planting Fields Arboretum

H2M demonstrated the functional and aesthetic quality possible with innovative green infrastructure systems.  The combination of porous and permeable pavements with vegetated swales virtually eliminated all stormwater runoff in the main parking area.   It also aesthetically enhanced an area that is typically barren and harsh […]

SUNY Purchase Quad

H2M rehabilitated this courtyard shaped by four residence halls that house up to 1,200 students.  Significant grade changes were resolved in transforming unpaved student desire paths into ADA accessibility routes connecting to four new outdoor gathering spaces – a performance stage, a meditative garden, a […]

Sustainable Design – Interior Renovations

Ten years after the construction of a new Landmark Library, H2M renovated the Library’s interior after the Library received a $1,300,000 donation from a patron. Located within a mile of the Atlantic Ocean, Westhampton Free Library has been located on Library Avenue in Westhampton Beach […]

Community Center Design

H2M provided complete design and construction administration services for the development of the Incorporated Village of Floral Park Pool and Community Center. All architectural, structural, HVAC, plumbing and electrical design was performed in-house. In addition to the total renovation of the existing pool building, various […]

Auditorium Renovations and Lighting Upgrade

The existing auditorium at Pocantico Hills School was in need of an update to improve the acoustics and interior environment. The Pocantico Hills School in Westchester County, New York was built in 1932, with the Auditorium addition added in 1953. The school serves 400 students […]

Harbormaster’s Quarters

H2M was retained by the Incorporated Village of Freeport to design a new two-story, mixed use building at Sea Breeze Park at the end of Freeport’s well known “Nautical Mile.” This shingle style building built atop a grid of wood piles is a new destination […]

Conversion of High-Rise Office Building to Mixed Use

Having completed more than 6,000 residential apartments throughout New York City and the Metropolitan area, and with a long proven record of knowledge of the New York City Zoning Resolution, we were selected to repurpose an antiquated 13-story 1960’s office building into a modern luxury […]

Long Island High Technology Incubator

The Long Island High Technology Incubator is a non-profit organization dedicated to helping new technologically-innovative companies grow by providing them with a variety of support resources and services. They are dedicated to providing a variety of support resources and services, and their location on the […]

Juniper Valley Animal Hospital

Juniper Valley Animal Hospital had the opportunity to expand into this 60 year old building, which required significant structural modification and fire rating upgrades. It also needed to comply with energy code requirements for the first time. Starting out with just a shell of a […]

Assisted Living Building Design

Through its 167 units, this building provides luxury living with indoor and outdoor amenities for seniors looking for a lifestyle change. H2M provided civil, architecture, and MEP design services for the three story, 122,000 square ft Bristal at West Babylon. The 4 acre site is […]

Village of Garden City

H2M serves as the Village’s GIS consultant, providing ongoing advisory, technical and training support for their expanding GIS program.  Historically, the Village has developed a tremendous amount of data related to its physical assets.  Most recently, H2M provided GIS system integration support for the Village’s […]

Jericho Water District

H2M provided data analysis services to support the District’s evaluation of their existing service usage billing rate structure.  Manipulating a combination of GIS parcels, the District’s current customer list, and property tax data from Nassau County’s Assessment Department, H2M generated a comprehensive listing of properties […]

Energy Audit

H2M performed for the United States Postal Service (USPS) an energy audit for the Long Island City Main Post Office including site visit, utility bill analysis, and building modeling simulation.  Potential Energy Conservation Opportunities (ECO) and Equipment Repair/Replacements (EER) were investigated as part of this […]